During the borewell drilling, while the rig drills through hard rock substrate, it will come across fissures/ cracks in the rock through which water is discharged at high pressure into the borehole and due to which the water level rises up quite significantly in the borehole. After 3-5 days of drilling, the water level would stabilize and this is the static water level.